Search
FIRE STATION, WATERLOO
- On site: 2nd May 2015
- May 19, 2015
- 1 min read
Work is progressing well at the grade II listed Fire Station at Waterloo,
an extensive refurbishment project for Marstons at this prime London site.
The building has been lovingly restored and the front elevation is looking
fantastic. The internal space has been opened up to reveal more of the
original Fire Station aesthetic.
All stud work has been completed and first fix services are done. The new
kitchen has been formed ready for the pizza ovens, which arrive next week.
Works are due to complete on 22nd June.

![FullSizeRender[2].jpg](https://static.wixstatic.com/media/598cff_ec8c9b8fed864779a93fe44ff2fa07c8.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/598cff_ec8c9b8fed864779a93fe44ff2fa07c8.jpg)

![FullSizeRender[3].jpg](https://static.wixstatic.com/media/598cff_52cb4aba955c477c8630df2c9e723d9a.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/598cff_52cb4aba955c477c8630df2c9e723d9a.jpg)
![FullSizeRender[4].jpg](https://static.wixstatic.com/media/598cff_1f3826eeb87e48bd92d01e4f0ee9d51a.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/598cff_1f3826eeb87e48bd92d01e4f0ee9d51a.jpg)